Estudio de prefactibilidad para la instalación de una Fábrica de barras y varillas trefiladas de acero
Aldave, Mariano Martín ; Borroni, Nicolás Ezequiel ; Chen, Juan Esteban ; Guendler, Matías Ariel ; Jardón, Iván ; Porres, Francisco
Aldave, Mariano Martín
Borroni, Nicolás Ezequiel
Chen, Juan Esteban
Guendler, Matías Ariel
Jardón, Iván
Porres, Francisco
Type
Proyecto final de grado
Citations
Altmetric:
Abstract
"Este proyecto estudió la prefactibilidad de producir barras trefiladas y varillas roscadas de acero en Argentina para comercializar localmente. Se realizó un estudio de mercado para comprender la potencial demanda a satisfacer, un estudio de ingeniería para analizar los requerimientos técnicos y particularidades del proyecto, un dimensionamiento económico-financiero para comprender su capacidad de generar valor y obtener demás índices relevantes, y finalmente un análisis de riesgos para mitigar mediante estrategias aquellos que generan más impacto, con el fin de maximizar la probabilidad de que el VAN fuera positivo. Se obtuvo para el escenario base un VAN del proyecto de 3.50 M U$D y TIR del 22% (con PR descontado de 4,7 años), y un VAN CFE de 0.5M U$D con TOR del 19%. Con las estrategias de mitigación, ambos VAN aumentaron más de un 30% y el período de repago descontado pasó a ser de 3.66 años".
"This project studies the pre-feasibility of producing drawn bars and threaded steel rods in Argentina to sell them locally. A market study was carried out to comprehend the potential demand that is to be satisfied, followed by an engineering study to analyze the technical and specific requirements of the project, an economic and financial dimensioning to find out its capacity to generate value and obtain other relevant indicators, and a risk analysis to mitigate with different strategies those if was possible, in order to maximize the probabilities of obtaining a positive NPV. For the base situation, the FCFF’s NPV was 3.50 M U$D and its TIR was 22% (with discounted Payback period of 4.7 years), and the CFE’s NPV was 0.50 M U$D with a TOR of 19%. With the mitigation strategies both NPV´s were incremented in more than 30% and the discounted payback period of 3.66 years".
Description
Date
2023-12-04
Journal Title
Journal ISSN
Volume Title
Publisher
Instituto Tecnológico de Buenos Aires (ITBA)
Collections
Files
Loading...
G3.pdf
Adobe PDF, 5.24 MB
Research Projects
Organizational Units
Journal Issue
Keywords
BARRAS, VARILLAS TREFILADAS, ACERO, FÁBRICA